There has recently been quite a bit of activity at our new house, working hard so that we can move in some time this summer.  At this point we are pushing back the move in date from June to July at the advice of our contractor.  Our list of accomplishments so far:

– Insulated the crawl space under the front 1/3 of the house

– Took out everything in the kitchen (cabinets, appliances, two layers of flooring)

– Took out everything in the downstairs bathroom (except the sink which we are going to try to salvage)

– Took out everything in the upstairs bathroom

– Peeled off wallpaper in two rooms

– Mapped the electrical situation in the house

– Tore up the carpet on the second floor

– Selected a contractor and came up with a definitive list of to dos (which then got revised a few times to bring down the cost)

– Picked out and purchased tile for the kitchen floor

– Bought a new fridge

– Contractor took down upstairs wall between bathroom and bedroom